

Primary Packaging
Polymer Films & Products
Products Range




Quality Control and Assurance

All our raw materials are received according to internal standards and applicable regulations. Each raw material and/or component is put through prior qualification dependent on the final use. This qualification includes a list of required statements from the supplier that is of the component and/or raw material that are in contact with the product flow.
Beyond these requirements, Dreure performs a qualification of the proposed component and/or raw material internally. For raw materials, the internal qualification will include machinability and physical performance of the bags made with this raw material. For components, the qualification will be centered around the testing of the assembly of the new component with other components and|or bags that will be attached.
In-coming materials are inspected upon arrival at Dreure against approved control specifications. Only approved materials will be allowed to be used in production of single-use products manufactured by Dreure.

Dreure has an upstream traceability system for incoming raw materials and a downstream traceability system for customers production batch.
This is based on the establishing of a batch record for each product manufactured according to the applicable procedure. The batch record includes more particularly the following information:
- · Results of in-process controls
- · Equipment number
- · The batch numbers of the raw materials and components used
- · The operators identification
- · The machine parameters(where applicable)
- · The tooling used (where applicable)
- · The dates of manufacture.
The QA is responsible for collecting all of batch file and archive after production. With this system, it is possible to work back through the history of a product and to seek the causes of any deviation. Meanwhile, the product shipped to the customer has its sales record and batch number which for the traceability if there is any deviation.

Quality controls are performed at critical process stages during the manufacturing. Some of these controls are listed below (other specific controls can be performed that are not listed and depend on the specific application of the product):
- ·Product conformity against technical drawing
- ·Visual inspection (seals, particles or contamination, film, assembly, etc.)
- ·Air leak test
- ·Dimensional check
- ·Product packaging controls
- ·Product labeling controls
After production, representative samples of finished products are tested. As the test result is acceptable, every batch of finished products will be released by Quality Assurance before it can be shipped to the customer. A Certificate of AnalysIs is issued for each batch of finished product that is shipped from Dreure.

More About Dreure





Discuss Your Film Development Requirements.
- Can film dimensions and thickness be customized?Yes. Thickness, width, tolerances and roll, sheet or tubular-film supply formats can be developed around project requirements and manufacturing feasibility.
- Can Dreure develop a film for a new bag or single-use product?Yes. Film development can be coordinated with finished-product geometry, sealing, conversion, components, process conditions and documentation requirements.
- What information is needed to begin film development?Provide the intended use, contact media, dimensions, operating and storage temperatures, sterilization method, downstream conversion, annual demand and required standards or documents.
- What information is needed to begin film development?Provide the intended use, contact media, dimensions, operating and storage temperatures, sterilization method, downstream conversion, annual demand and required standards or documents.


































